| Date: |
3-21-2014 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Gretz Pitot Mast doubler / cut-out |
|
|
The Gretz doubler installation was very straight forward, but very time consuming as I made every possible effort to get the doubler installed square with the world so that I dont have a sideways flying Pitot in the future! I also drilled an extra set of bushing holes in my wing ribs to allow easy routing of my pitot, and AOA lines. |
||