Date:    5-5-2016
Number of Hours:    15.00
Brief Description:    New Horizontal Stab
I determined that I was not comfortable with the H.S. that the previous builder had built. There were several blown out holes in critical parts such as the attach angles and the spar fishmouth doubler.