| Date: |
2-20-2016 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Door Buildup |
|
|
I drilled the hinges to the doors and cabin top. The Pilot door required a one-washer shim on the fwd hinge to bring the door flush with the cabin. This is permissible in the instructions. |
||