| Date: |
6-19-2010 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Finished Right Wing |
|
|
Perform final leak check on fuel tank. Replaced suppled fuel line with Gates ethanol friendly fuel line. Rechecked torque on all spar bolts added for the wing upgrade. Riveted rear skin and nose skin in place. Did not rivet aileron or flap in place at this time. Did not install wingtip at this time. |
||