Date:    9-11-2019
Number of Hours:    6.00
Brief Description:    Taping left wing
Eric E, Bryan, Matt, Pete, and Lawson got all the 2" tapes added to the bottom of the ribs on the left wing. EricE worked primarily to smooth the edges of the tapes over the false ribs on the bottom of the left wing.