Date:    4-26-2013
Number of Hours:    3.50
Brief Description:    Left Wing Leading Edge
Built the leading edge cradle. Used LE rib to trace the shape. I used a jig saw to rough cut the shape then used sander to cut to final shape.

Began assembly of left LE.
fluted/ straightened ribs
beburred ribs