Date:    1-29-2007
Number of Hours:    1.25
Brief Description:    left elevator
finished the left elevator riveting, then installed it on the HS,,, trimmed the HS so the elevator would swing freely, cut and installed the HS fiberglass cap,, need to "filll" the end and rivet it on.