| Date: |
10-9-2006 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
installed flap control bar and control bar |
|
|
pre-fit the flap control bar.... fitted and drilled the blocks on the drill press. Fit them to the floor and drilled with a number 12 on the right angle dirll,, glad I have that piece of equipment. Placed the an3-7a's in the holes to "pin" them. Drilled the contol bar bearing holes out to fit the an3 hardware. installed the bearings, then temporarily set them in place. |
||