| Date: |
8-24-2006 |
|
| Number of Hours: |
3.75 |
|
| Brief Description: |
elevators |
|
|
prepared skins, primed insides of skins. cut all of the stiffners for both elevators. clecoed the stiffners to both skins and drilled them out, as per plans (including PP 615). disassembled. |
||