| Date: |
9-7-2015 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Left upper gear fairing |
|
|
I molded clay on the upper gear fairing. I installed the aluminum piece on the trailing edge to allow seperation of the trailing edges. I laid up two layers of fiberglass. |
||