| Date: |
5-20-2017 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Installed instrument panel |
|
|
I believe that the installation of the instrument panel is permanent. I fabricated two braces to support the throttle and propeller controls. Took a couple of iterations to get it right. I spared you the failed designs |
||