| Date: |
11-29-2014 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Installed the horizontal stabilizer |
|
|
I was working to level the plane out in preparation to drilling the rear spar bolts on the wing but I needed to install the empennage to be able to get my centerline down the fuselage. I want to be sure that I am able to reference the center of the vertical stabilizer. |
||