Date:    3-17-2019
Number of Hours:    8.00
Brief Description:    Installing fuselage access door
Worked on installing the fuselage access door above the avionics. Fabricated backer and spacer from carbon fiber, bedded them in with micro/epoxy mixture, and riveted. Next step will be to install the door. I have it ready and rough trimmed.