| Date: |
3-17-2019 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Installing fuselage access door |
|
|
Worked on installing the fuselage access door above the avionics. Fabricated backer and spacer from carbon fiber, bedded them in with micro/epoxy mixture, and riveted. Next step will be to install the door. I have it ready and rough trimmed. |
||