| Date: |
2-28-2019 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Installing oil door |
|
|
I applied epoxy and cotton flox to bed in the oil door latch and SS backing plate. After this I will apply two reinforcement strips on the backside of the oil door so that air pressures will not distort the door and make it pop open in flight. |
||