| Date: |
10-15-2017 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Laid fiberglass on FAB |
|
|
I have the FAB mounted and filled the void with spray foam, let it cure, and then used lightweight spackling to smooth the transition. The first layer of fiberglass used was a 9 oz fabric 5" x 12". Used a 9" ballon to form the fiberglass to the FAB transition. |
||