Date:    10-15-2017
Number of Hours:    5.00
Brief Description:    Continued on FAB
I deviated from plans a litte. I cut the FAB back a little further. I saw this done by other and it makes for a cleaner transition to the cowling.

After that I installed the FAB and found that it was about 3/8" from the left side of the cowling. I took apart the inlet and fabricated an offset.