| Date: |
10-2-2017 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Air box |
|
|
Working again on the air filter. Trying to figure out what to do about the leading edge of the airbox. I got some advice from Vans Airforce. Just so happens that the aluminum part lines up perfectly with the bottom edge of the upper snorkel lip. So I carved a V slot in the fiberglass to straighten it out. I drilled our the rivets on the edge and sanded the fiberglass even with the aluminum. Then I applied four layers of fiberglass to fill in the void. Will sand smooth once it cures. |
||