| Date: |
6-26-2017 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Alt air cable installed |
|
|
One would think that this would have been a 15 min job to run the alternate air cable from the panel through the firewall. A bracket was in the way and had to be trimmed. Getting the bracket in and out 5 times took some time. Just another day in the airplane factory. The firewall sealant will be injected later when I have to seal several upcoming electrical penetrations. |
||