Date:    7-25-2009
Number of Hours:    7.00
Brief Description:    Fuselage work continues
Assembled and installed main gear wheels and tires. Assembled nose gear fork, wheel and tire. Installed nose gear on aircraft. Total construction time now at 244 hour.