Date:    5-14-2009
Number of Hours:    4.00
Brief Description:    Elevator completed
Elevator riveting was completed. Elevator was mated to the horizontal stabilizer while inverted on a level surface. The elevator and horizontal stabilizer are now ready for final assembly on the fuselage.