| Date: |
5-5-2009 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Elevator work continues |
|
|
Leading edge skins were fitted the elevator. During the task, the elevator was flipped over several times and clamped to the flat work surface to maintain the alignment between the left and right side of the elevator. |
||