Date:    7-2-2008
Number of Hours:    38.00
Brief Description:    Front and Rear Spar Construction
Construction of stand
Prepare ---Riveted the front and rear spar of the Horizontal Stabilizer.
Riveted the ribs to the front spar. Assemble Frame for HS