Date:    8-24-2011
Number of Hours:    2.00
Brief Description:    bond left elevator
Installed elevator bottom in Jig. Sanded and prepped left elevator halves, bonded left elevator halves with hysol. Installed top of the jig. Cleaned squeeze out.