| Date: |
3-11-2009 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
More drilling |
|
|
Finished match drilling the aft and front cap strips for the right rear spar. Then I drilled the aft cap strips to the webbs for the left rear spar and then started match drilling the aft caps to the front caps for the left spar. |
||