| Date: |
2-10-2010 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
Empennage Fairings |
|
|
Pg. 12-06 Step 3: Drilled a 3/4" hole in the F-1294A Upper Tailcone Fairing using a Unibit. Drilled two #30 holes on each side of the fairing at the designated locations on the plans. Step 4: Trimmed the excess material from the Upper Tailcone Fairing in the same way as the lower fairing was done. Had to use a brush handle to sand the curved edges. Lots of fiberglass dust. Respirator advised. I used the hearing protection mostly while cutting with the Dremel tool. |
||