| Date: |
2-6-2010 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Landing Gear & Engine Mount |
|
|
Pg. 35-06 Step 3: After locating a letter "I" drill and drilling the two holes in the top of the Nose Fork Assy., I tapped the holes with a 5/16" X 24 tap. Threaded and torqued cap screws into the Nose Fork Assy. |
||