Date:    2-6-2010
Number of Hours:    0.50
Brief Description:    Landing Gear & Engine Mount
Pg. 35-06
Step 3: After locating a letter "I" drill and drilling the two holes in the top of the Nose Fork Assy., I tapped the holes with a 5/16" X 24 tap. Threaded and torqued cap screws into the Nose Fork Assy.