| Date: |
12-2-2009 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Rollover Struct. / F-1207 Bhd |
|
|
Pg. 24-05 Step 4: Installed the snap bushings in the F-1207D-L Baggage Bulkhead Channel. Step 5: Clecoed and riveted the F-1232A Roll Bar Brace to the F-1232B-L&R Roll Bar Brace Brackets. Clecoed the assembly to the Roll Bar Assy and Baggage Bulkhead. Machine countersunk the holes in the upper side of the Roll Bar Brace. Step 6: Clecoed and riveted the F-1207K Brace Angle to the Rt Baggage Bulkhead. |
||