Date:    10-10-2009
Number of Hours:    1.00
Brief Description:    Fuse Wire Harness
Pg. 31-03
Step 3: Installed the Wire Run Conduit in the Center Section Assy.
Step 4: Replaced the inboard bolt and installed VA-188B Standoff and cushioned clamp on FLO-SCAN Fuel Flow Transducer.