Date:
10-6-2009
Number of Hours:
1.00
Brief Description:
Side Skins
Pg. 23-06
Step 3: Match-drilled #30 and clecoed the Fuselage Side Skin, Roll Bar Attach Plate and the Lt. Longeron.