| Date: |
8-17-2009 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Side Skins |
|
|
Section 23 Deburred (2) F-1096 Vent Doublers and (2) F-1093 Vent Doors, (2) F-1248B Fuselage Pin Latch. Primed (2) F-1086A, (2) F-1086B, (2) F-1087A, (2) F-1087B, (2) F-1092, (2) F-1093, (2) F1096's, F-1205B-L&R, F-1205A, F-1205C, F-1203G-L&R, F-1232B-L&R, F-1254-L&R, F-1234-L&R and F-1202-L&R. Pg. 23-07 Step 2: Clecoed the Vent Slides, Vent Door Doublers and Vent Doors together. Final-drilled #40 the common holes. Performed this step for both vents. Step 3: Machine countersunk the holes on the outside of the Vent Doors. Step 4: Filed the curved slots in the Vent Slides to operate smoothly with an AN525-10R7 Screw. Step 8: Riveted the Vent Slides, Vent Door Doublers and Vent Door together for both vents. |
||