Date:    8-8-2009
Number of Hours:    3.50
Brief Description:    Side Skins
Section 23
Prepped the Longerons for Priming. Deburred the F-1204F-L&R Aft Side Bulkheads, F-1234-L&R Canopy Decks (Step 5) pg 23-02 and F-1205B-L&F Roll Bar Attach Plates.