Date:    8-3-2009
Number of Hours:    4.50
Brief Description:    Fwd Lwr Fuse
Pg.22-02
Step 12: Completed riveting the Firewall Spacers and Cowl Attach Plates to the Fwd Lower Fuse Assy.
Pg. 22-03
Step 1: Separated and deburred four F-1257 Rudder Pedal Support Channels.
Step 2: Dimpled the aft two holes and nutplate attach holes in the Rudder Pedal Support Channels and Firewall Shelf.
Step 3: Dimpled and riveted the nutplates to the Firewall Shelf and Rudder Pedal Support Channels.
Step 5: Filled tooling holes in the Firewall Bottom with blind rivets.
Step 9: Clecoed the F-1201L Bracket to the Firewall Bottom. Match-drilled #30 and clecoed the inbd flg holes to the Rt Tunnel Rib. Match-drilled #12 the Gascolator attach hole in the bracket.
Step 10: Deburred the Tunnel Rib and Bracket. Primed the bracket.