Date:    7-29-2009
Number of Hours:    5.50
Brief Description:    Fwd Lwr Fuse
Section 22
Deburred F-1272 Fwd Fuse Skin
Pg. 22-02
Step 4: Clekoed, final drilled #30 and riveted the Engine Mount Brackets to the Tunnel Ribs.
Step 5: Machine Countersunk the four holes in the fwd flg of the Tunnel Ribs at the location of the CS4-4 rivets.
Step 6: Clecoed and riveted the Tunnel Ribs to the Fwd Fuse Skin. Then riveted the Firewall Bottom and Fwd Fuse Corner Skins ot the assy. ( not complete)