| Date: |
6-9-2009 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Ctr Sec Blkhd Pg. 20-3 |
|
|
Morning was taken up with delivery of my hanger door. Step 2: Released the pressure of the clamps briefly, then proceeded to match drill #30 the seventy one holes identified on the drawing. Used a drill guide as we were drilling through thick material. Started in the center and proceeded outward. Two additional holes were drilled #11. Holes were clecoed as I proceeded. Step 5: Separated the F-1204P-L&R Skin Attach Flanges. Step 6: Separated the F-1204T-L&R Skin Stiffeners. Deburred and primed the F-1204P-L&R, F-1204T-L&R, and F-1204F-L&R. |
||