| Date: |
6-8-2009 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Ctr Sec Bkhd Pg. 20-2, 20-3 |
|
|
Completed Deburring Center Section Af Bulkhead. Pg. 20-2 Step 1: Countersunk nutplate rivet hole on Center Section Assy. Installed nutplates. Center nutplates were to use CCR-264SS-3-2 rivets, however these did not secure the nutplates tightly. Used AN426AD3-4 rivets set with a rivet gun. Step 2: Final drilled the holes in the Rt. Fwd Bulkhead Side Assy. Installed the Retainer Block and final torqued. Step 3: Final drilled the Center Section Assy and installed the Retainer Block and final torqued. Step 4: Inserted two AN4 bolts in the 1/4" holes of the Center Section Aft Bulkhead to support Center Section Channel. Clamped the Center Section Assy to the Aft Center Section Bulkhead using five spring clamps. Pg.20-3 Step 1: Placed the Bottom Skin on top of two 2X4's which were placed across two saw horses. The clamped bulkhead assy were clecoed to the Bottom Skin. |
||