| Date: |
8-24-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Fuselage Wiring Harness |
|
|
Pg. 31-12 Step 2: P-30 Trim Wires forward following the path of the Static Line. Passage through bulkheads has become very tight. Was able to proceed only half way. Stopped at the System Blocks. |
||