Date:    8-24-2010
Number of Hours:    2.50
Brief Description:    Fuselage Wiring Harness
Pg. 31-12
Step 2: P-30 Trim Wires forward following the path of the Static Line. Passage through bulkheads has become very tight. Was able to proceed only half way. Stopped at the System Blocks.