| Date: |
8-20-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Flight Controls |
|
|
Pg 32-13 Step 1: Secured the Rudder Cables to the horns of thr Rudder Pedals using the Rudder Cable Links and hardware provided. Pg. 32-02 Rev 1 Step 3: Secured the L & R Reservoir Brake Lines and Cross-Over Brake Lines to the bottom of the Base Panel using the AL .197 X .313 X .968 stand-off, cushion clamp and hardware provided. This keeps the brake lines from chaffing on bolting which penetrates the Firewall. |
||