| Date: |
5-29-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Miscellanea |
|
|
Pg. 33-04 Step 3: Test fit the Non-skid Step Floors to the Step Floors. Removed the backing and adhered them to the clean and dry Step Floor Area. Painted the Step Floor Area with Gray Stone paint. |
||