| Date: |
4-24-2010 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Canopy Installation |
|
|
Sanded the micro on the right side Canopy Arm transition. Fabricated a plexiglass plug for the oversize hole at the Canopy Latch to keep out water and air drafts. |
||