Date:    4-22-2010
Number of Hours:    2.00
Brief Description:    Canopy Installation
Sanded the micro on the repair area of the left side Canopy Arm. Wet sanded the transition areas between the wet lay-ups and Canopy Skirts to smooth the transition.