| Date: |
4-22-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Canopy Installation |
|
|
Sanded the micro on the repair area of the left side Canopy Arm. Wet sanded the transition areas between the wet lay-ups and Canopy Skirts to smooth the transition. |
||