| Date: |
4-14-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Canopy Installation |
|
|
Sanded the micro on the inside of the Canopy Arms. Pg. 34-16 Opened Canopy to check for interference. More sanding is required on forward portion of the arms. Pg 34-16 Step 5: Brush-coated the Canopy Foam inside the pivot bolt cavities with epoxy and flox |
||