| Date: |
4-7-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Canopy Installation |
|
|
Pg. 34-16 Step 1: Removed the Canopy with much difficulty. Dripping resin had bonded to the Fuse in a few spots. Used a Wilfork Icing knife to loosen the fiberglass at the edges. Step 2: Trimmed the edges that overlap the Fuselage Side Skin using a straight edge to line up the edge with the bottom of the Skirt. |
||