| Date: |
4-1-2010 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Canopy Installation |
|
|
Pg. 34-15 Step 5: Sanded the Bondo and Putty areas with 320 grit paper. After sanding I found more low spots and pin holes. Built up these areas with Bondo and spotting putty. Some were in the previously applied Bondo. |
||