| Date: |
3-20-2010 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Canopy Installation |
|
|
Pg. 34-15 Step 5: Removed the second layer of electrical tape and sanded with 150 grit until the aft edge was down to the first layer. Discovered I have some areas at the aft pointed location and bottom edges on both side that do not have enough coverage. Will have to contact Van's for directions. |
||