| Date: |
3-9-2010 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Canopy Installation |
|
|
Pg. 34-12 Step 4: Took the Canopy off and measured, marked and drilled the upper #30 holes in the Roll Bar Frame. Tapped the holes 8-32 on both sides. Attached the Guide blocks to the Canopy Frame. Step 5: Rotated the Guide Blocks until the lower corner was tangent with the outer edge of the Roll Bar. Marked, Drilled #30 and tapped the lower holes into The Roll Bar. Removed to clear the chips and reinstalled. Pg. 34-09 Step 2: Clecoed the Canopy to the Canopy Frame along the front bow. |
||