| Date: |
3-24-2009 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Tail Cone Pg. 10-4 Rev. 1 Stp. 10-14 |
|
|
Step 10: Riveted the Nutplates to the Bulkhead Assy. Step 11: Clecoed the Hinge Brackets and Flange Bearings together. Step 12: Final-drilled the #30 holes in the Hinge Brackets and Bearings. Step 13: Riveted the Hinge Brackets, Bearings and Fuse. Assy. together. Step 14: Inserted SB437-4 Bushing into the Bulkhead Assy. after drilling hole out to 7/16" with a Unibit. |
||