| Date: |
3-23-2009 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Tail Cone Pg. 10-4 Rev.1 Stps. 1-9 |
|
|
Step 1: Riveted Attach Brackets together and pressed in bushings. Step 2: Slightly flutted Bulkhead flange as required. Step 3: Clecoed the the Fuselage Bulkhead to the Bulkhead Doubler. Step 4: Clecoed the Tail Skid Bracket to the Bulkhead. Step 5: Match-drilled the #30 holes into the Tail Skid Bracket. Step 6: Final-drilled the #12 holes into the Bulkhead. Step 7: Clecoed the Attach Brackets and Tail Skid to the Bulkhead Assy. Step 8: Riveted the Fuselage Bulkhead to the Doubler. Step 9: Riveted the Attach Brackets and Tail Skid Bracket to the Assy. |
||