Date:    2-17-2009
Number of Hours:    7.50
Brief Description:    Verticle Stab. Pg. 6-5
Steps 3-6. Riveted Front VSpar to Lower Main rib and nutplates. Riveted Upper Main rib to Front VSpar. Riveted Lower Spar Caps to R VSpar. Riveted Upper and Lower Main Ribs to Rear VSpar and Lower Spar Caps.