| Date: |
2-13-2009 |
|
| Number of Hours: |
7.50 |
|
| Brief Description: |
Verticle Stab. Pg. 6-3 |
|
|
Step 6-7. Match drilled #40 Nutplate rivet holes from Rear VSpar into Upper Spar Caps, also bottom holes of Rear VSpar into lower Spar Caps. Match drilled #12 holes of Rear VSpar into Upper and Lower Spar Caps. Deburred holes and cleared chips. Primed Rear VSpar; Upper and Lower Spar Caps; Upper and Lower Hinge Assys. |
||