Date:    2-11-2009
Number of Hours:    3.00
Brief Description:    Verticle Stab. Pg.6-2 and 3
Completed Step 8. Clecoed Lower Hinge Spacer between two Hinge Brackets and drilled #30 holes.
Completed Step 1. Separated and deburred Upper and Lower Spar Caps.